BiFolded Laser Measure
Job
Units
LEFT CENTER RIGHT U D TOP MID BOT L R L R
Height Measurements 3 positions across width

At each position: measure from the top of the opening down to the laser line (Up), and from the floor up to the laser line (Down)

Left end of opening
Centre of opening
Right end of opening
Width Measurements 3 heights up the opening

At each height: measure from the left jamb to the laser line (Left), and from the right jamb to the laser line (Right)

Top of opening
Mid-height of opening
Bottom of opening
Clearances (optional)

Gap to deduct from the opening on each side

Results